ECO Energy / Energy Case Studies

Energy Case Studies

Watch real-world examples from manufacturing, hotels, convenience stores and education.

Choose a project to open its case study and video here on ECO Energy.

These are projects involving Best.Energy technology or the providers identified in the video, not ECO Group installations. Results vary by building.

Best.Energy technology in action

These are results published by Best.Energy for projects using its technology—not ECO Group installations or a prediction for your building.

7-Eleven, Denmark

Best.Energy reports average energy savings of 11.5% across 120 convenience stores.

KFC, Malaysia

The manufacturer reports average energy savings of 18% across a 105-site project.

Hillsborough County Public Schools, USA

Best.Energy reports more than $8 million in annual energy savings across the school district.

More project examples

Its case-study collection includes banking, hospitality, supermarkets and other commercial settings.

Results depend on the building, baseline and implemented measures. Explore the project results guide

Explore the details

Case-study guide: published Best.Energy results

Best.Energy publishes the following examples from projects involving its technology:

  • 7-Eleven, Denmark: average reported energy savings of 11.5% across 120 stores.
  • KFC, Malaysia: average reported energy savings of 18% across 105 sites.
  • Hillsborough County Public Schools: reported annual energy savings exceeding $8 million.

These are manufacturer-reported project results, not ECO Group customer reviews. The figures describe different scopes and operating conditions. Ask how a proposed project's baseline, measurement period and operating changes would be assessed before comparing expected results.

Let's look at your building.

Energy Monitoring Discovery Call

More examples from the reference collection

Kings Point retirement community · Florida

The supplied case study reports up to a 35% reduction in annual energy spend and $120,000 saved in the first year. The project combined monitoring with equipment and control upgrades around a clubhouse and related systems.

This was another provider's project. The “Eco Energy” named in that document is not presented as ECO Group, Inc.

International airport · Lima, Peru

The supplied EnergyCloud/IBM case study describes monitoring 1,417 circuits and identifying 22% energy-saving opportunities during the initial chiller-focused work. It also describes using data for maintenance and tenant billing.

Identified opportunities are not the same as independently verified realized savings.

Historical manufacturer/partner case studies, not ECO Group installations or a prediction for another property.